5571 Commercial Blvd. Winter Haven, FL 33880

Past Projects

Delve into a showcase of Davidson Fabrication and Welding’s noteworthy accomplishments. Each completed project stands as a testament to our expertise and dedication.

Coca-Cola Project X

  • Subcontractor for RC Stevens
  • Structural steel elevated platforms, Modifications, and Retrofit of New Equipment

DANONE NORTH AMERICA

  • Structural steel fabrication of access platforms, new equipment processing areas, pipe-supports.

FPL West County

  • Subcontractor Direct to Florida Power and Light
  • Fabrication and Installation of 24 Condenser Platforms 

Irby Construction

  • Subcontractor Direct to Irby
  • Modifications to the Fleet of Equipment Trailers and Repairs

Disney World Drive Phase 2

  • Subcontractor to Garney Mechanical
  • Installation and Welding of 3600 LF of 20″ Chiller Piping

Reedy Creek

  • Subcontractor Direct to RCES
  • Fabrication and Installation of 4 Aluminum Access Platforms at EPCOT Facility

Secured Global

  • Subcontractor direct to Secured FP
  • Fabrication of Aluminum Stanchions and Structural Items for Fall Protection Devices

Tampa Electric

  • Subcontractor Direct to TECO
  • Fabrication of Pump Guards, Corrugated Siding, and Stainless Steel Exhaust Ducts

Space X

  • Subcontractor Direct to SpaceX
  • Fabrication of Structural Landing Platforms for Launch Towers
A Metal Ladders And A MachineA Group Of Men On A Platform
A Metal Vent On A TableA Metal Structure On A Concrete Floor
A Metal Staircase In A FactoryUnfinished Metal Stairs
Stainless Cable RailA Metal Platform

Coca-Cola Project X

  • Subcontractor for RC Stevens
  • Structural Modifications and Retrofit of New Equipment
  • Contact: Allyn Brice – (407) 466-6283

FPL West County

  • Subcontractor Direct to FPI
  • Fabrication and Installation of 24 Condenser Platforms
  • Contact: Daniel Reyes – (561) 339-5493
A Metal Ladders And A MachineA Group Of Men On A Platform

Irby Construction

  • Subcontractor Direct to Irby
  • Modifications to the Fleet of Equipment Trailers and Repairs
  • Contact: Cameron Hall – (601) 862-6846

Disney World Drive Phase 2

  • Subcontractor to Garney Mechanical
  • Installation and Welding of 3600 LF of 20″ Chiller Piping
  • Contact: Josh Petro – (302) 584-5761
A Metal Vent On A TableA Metal Structure On A Concrete Floor

Reedy Creek

  • Subcontractor Direct to RCES
  • Fabrication and Installation of 4 Aluminum Access Platforms at EPCOT Facility
  • Contact: Rich Dwyer – (407) 824-4543

Secured Global

  • Subcontractor direct to Secured FP
  • Fabrication of Aluminum Stanchions and Structural Items for Fall Protection Devices
  • Contact: Eric Worswick – (239) 633-2543
A Metal Staircase In A FactoryUnfinished Metal Stairs

Gulf Coast Industrial

  • Subcontractor Direct to GCI
  • Fabrication of Pump Guards, Corrugated Siding, and Gutters for Tampa Electric
  • Contact: Casey Christian – (813) 951-6281

A&B Maintenance

  • Subcontractor Direct to A&B
  • Fabrication of Drag Conveyor for Gopher Industries
  • Contact: Adam Pitts – (813) 391-8288
Stainless Cable RailA Metal Platform